Part 1 - Application Documents
Application
Plans and Drawings
- 1.02 Existing site location plan
- 1.03 Existing site plan
- 1.04 Existing site elevation – northeast
- 1.05 Existing site elevations
- 1.06 Existing site section
- 1.07 Proposed site plan
- 1.08 Proposed block plan
- 1.09 Proposed building – Basement 2 plan
- 1.10 Proposed building – Basement plan
- 1.11 Proposed building – Ground floor plan
- 1.12 Proposed building – 1st floor plan
- 1.13 Proposed building – 2nd floor plan
- 1.14 Proposed building – 3rd – 6th floor plan
- 1.15 Proposed building – 7th floor plan
- 1.16 Proposed building – 8th – 13th floor plan
- 1.17 Proposed building – 14th – 15th floor plan
- 1.18 Proposed building – Roof plan
- 1.19 Proposed building – North west elevation
- 1.20 Proposed building – North east elevation
- 1.21 Proposed building – South east elevation
- 1.22 Proposed building – South west elevation
- 1.23 Proposed building – North east site elevation
- 1.24 Proposed building – South east site elevation
- 1.25 Proposed building - Section AA
- 1.26 Proposed building - Section BB
- 1.27 Proposed layouts Typical Ensuite 01
- 1.28 Proposed layouts Typical Ensuite 02
- 1.29 Proposed layouts Typical studio
- 1.30 Proposed layouts Typical accessible studio
- 1.31 Detail elevation study 01
- 1.32 Detail elevation study 02
- 1.33 Detail elevation study 03
- 1.34 Detail elevation study 04
- 1.35 Detail elevation study 05
- 1.36 3D Massing Model 20221
- 1.37 Landscape GA
- 1.38 Landscape Terrace
Documents
- 1.39-1 Design and Access Statement - Accessibility Statement
- 1.39-2 Design and Access Statement - Secure by Design Statement
- 1.40 Accommodation and Area Schedule
- 1.41 Landscape Statement (including Urban Greening Factor calculation)
- 1.42 Letter of support from the University of London
- 1.43 Letter from ETC Venues
- 1.44 Planning Statement
- 1.45 Air Quality Assessment
- 1.46 Flood Risk Assessment and Drainage Strategy (including SuDs Proforma)
- 1.47 Delivery and Servicing Management Plan
- 1.48 Car Park Management Plan
- 1.49 Outline Construction Logistics Plan
- 1.50 Student Management Plan (Transport)
- 1.51 Framework Travel Plan
- 1.52 Noise and Vibration Assessment
- 1.53-1 Utilities and Services Statement (Part 1)
- 1.53-2 Utilities and Services Statement (Part 2)
- 1.53-3 Utilities and Services Statement (Part 3)
- 1.54 Healthy Streets Transport Assessment
- 1.55-1 Daylight and Sunlight Assessment
- 1.55-2 Window Locations
- 1.56 Overheating Assessment
- 1.57 Circular Economy Statement
- 1.58 Energy Strategy (including Carbon Emissions Reporting Spreadsheet)
- 1.59 Sustainability Statement (including BREEAM Pre- Assessment)
- 1.60 Life Cycle Carbon Assessment
- 1.61 Archaeological Desk-Based Assessment
- 1.62 Fire Statement
- 1.63 Preliminary Ecological Appraisal
- 1.64 Wind Micro-Climate Assessment
- 1.65 Statement of Community Involvement
- 1.66 Engagement Summary (Development Consultation Charter)
- 1.67-1 Ground Investigation and Basement Impact Assessment (Part 1)
- 1.67-2 Ground Investigation and Basement Impact Assessment (Part 2)
- 1.67-3 Ground Investigation and Basement Impact Assessment (Part 3)
- 1.68 Student Housing Management Plan
- 1.69 Heritage, Townscape and Visual Assessment - November 2021
- 1.70 Aboricultural Survey
- 1.71 Arboricultural Impact Assessment, Arboricultural Method Statement and Tree Protection Plan 5810/21-02 Rev 1
- 1.72 Plant Assessment
- 1.73 Viability Report (Private and Confidential) and Executive Summary (Public)
- 1.74 Southwark Student Housing Demand Study
- 1.75 Employment Land Report