Part 2 - Documents Post-Application
Document submitted on 03 February 2022
Document submitted on 20 April 2022
Documents submitted on 13 May 2022
Documents, drawings and plans submitted on 27 May 2022
- 2.06 Proposed building – Basement 2 plan
- 2.07 Proposed building – Ground floor plan
- 2.08 Proposed building – 2nd floor plan
- 2.09 Proposed building – 3rd – 6th floor plan
- 2.10 Proposed building – 7th floor plan
- 2.11 Proposed building – 8th – 13th floor plan
- 2.12 Proposed building – 14th – 15th floor plan
- 2.13 Proposed layout Typical Ensuite 01
- 2.14 Proposed layout Typical Ensuite 02
- 2.15 Foul and Surface Water Drainage Drawing
- 2.16 Applicant team’s response to GLA Stage 1 Report
- 2.17 Schedule of drawings (to be replaced)
- 2.18 Updated Fire Statement (25th May 2022)
- 2.19 TRICS Sensitivity Test
- 2.20 Inclusive Design Statement
- 2.21 Design and Access Statement Addendum
- 2.22 Sustainability Statement (24th May 2022)
- 2.23 Energy Strategy (24th May 2022)
- 2.24 Overheating Assessment (25th October 2021)
- 2.25 GLA Carbon Emissions Reporting Spreadsheet (Excel)
- 2.26 Stage 1 GLA Consultation – Energy Memo (Excel)