Part 5 - Revised drawings and other documents submitted after CMC1 in response to HSE consultation response
- 5.00 Response to HSE comments (26 October 2022)
- 5.01 Stitch Drawing Register 26.10.22
- 5.02 Proposed building – North west elevation 21235-STCH-XX-ZZ DR-A-1200 Rev B
- 5.03 Proposed building – North east elevation 21235-STCH-XX-ZZ-DR-A-1201 Rev B
- 5.04 Proposed building – North east site elevation 21235-STCH-XX-ZZ-DR-A-1204 Rev B
- 5.05 Proposed building – Basement 2 plan 21235-STCH-XX-B2-DR-A-1100 Rev D
- 5.06 Proposed building – Basement plan 21235STCH-XX-B1-DR-A-1101 Rev B
- 5.07 Proposed building – Ground floor plan 21235-STCH-XX-00-DR-A-1102 Rev F
- 5.08 Proposed building – 2nd floor plan 21235-STCH-XX-02-DR-A-1104 Rev B
- 5.09 Proposed building – 3rd-6th floor plan 21235-STCH-XX-ZZ-DR-A-1105 Rev A
- 5.10 Proposed building – 7th floor plan 21235-STCH-XX-07-DR-A-1106 Rev B
- 5.11 Proposed building – 8th-13th floor plan 21235-STCH-XX-ZZ-DR-A-1107 Rev B
- 5.12 Proposed building – 14th-15th floor plan 21235-STCH-XX-ZZ-DR-A-1108 Rev B
- 5.13 Proposed building – Roof plan 21235-STCH-XX-RF-DR-A-1109 Rev A