1 - Application Drawings
1 - Application Drawings
- CD1.01 17090-00-100-400 Location (Red Line) Plan December 2018
- CD1.02 17090-00-100-401 Composite Site Plan December 2018
- CD1.03 17090-00-100-402 Site Reference Plan December 2018
- CD1.04 17090-00-100-403 Existing Site Plan December 2018
- CD1.05 17090-00-100-404 Existing Site Plan North December 2018
- CD1.06 17090-00-100-405 Existing Site Plan Central December 2018
- CD1.07 17090-00-100-406 Existing Site Plan South December 2018
- CD1.08 17090-00-100-407 Proposed Site Plan December 2018
- CD1.09 17090-00-100-408 Proposed Site Plan – North December 2018
- CD1.10 17090-00-100-409 Proposed Site Plan – Central December 2018
- CD1.11 17090-00-100-410 Proposed Site Plan – South December 2018
- CD1.12 17090-00-100-411 Permitted Development Rights Reference Site Plan December 2018
- CD1.13 17090-00-200-400_00 Ground Floor Plan – Existing December 2018
- CD1.14 17090-00-200-401_0 Ground Floor Plan – Proposed December 2018
- CD1.15 17090-10-200-400_00 First Floor Plan – Existing December 2018
- CD1.16 17090-10-200-401_00 First Floor Plan – Proposed December 2018
- CD1.17 17090--10-200-400_00 Basement Floor Plan – Existing December 2018
- CD1.18 17090--10-200-401_00 Basement Floor Plan – Proposed December 2018
- CD1.19 17090-20-200-400_00 Mezzanine Floor Plan – Existing December 2018
- CD1.20 17090-20-200-401_00 Mezzanine Floor Plan – Proposed December 2018
- CD1.21 17090-ZZ-125-400_00 Roof Plan – Existing December 2018
- CD1.22 17090-ZZ-125-401_00 Roof Plan – Proposed December 2018
- CD1.23 17090-ZZ-300-400_00 South Terminal Extension & B1, B2 and B3 – Existing Elevations (Sheet 1 of 2) December 2018
- CD1.24 17090-ZZ-300-402_00 South Terminal Extension & B1, B2 and B3 – Existing Elevations (Sheet 2 of 2) December 2018
- CD1.25 17090-ZZ-300-401_00 South Terminal Extension & B1, B2 and B3 – Proposed Elevations (Sheet 1 of 2) December 2018
- CD1.26 17090-ZZ-300-403_00 South Terminal Extension & B1, B2 and B3 – Proposed Elevations (Sheet 2 of 2) December 2018
- CD1.27 17090-ZZ-300-404_00 West Terminal Extension – Existing Elevations December 2018
- CD1.28 17090-ZZ-300-405_00 West Terminal Extension – Proposed Elevations December 2018
- CD1.29 17090-ZZ-300-406_00 Terminal Canopies – Existing Elevations December 2018
- CD1.30 17090-ZZ-300-407_00 Terminal Canopies – Proposed Elevations December 2018
- CD1.31 40506-Bri074b Integrated/embedded Landscape, Visual and Ecology Mitigation Masterplan November 2018
- CD1.32 C1124-SK-A38-010 10.0 A38 Junction Improvements November 2018
- CD1.33 C1124-SK-A38-011 1.0 A38 Junction Improvements Vehicle Track Analysis – (Sheet 1 of 3) September 2018
- CD1.34 C1124-SK-A38-012 1.0 A38 Junction Improvements Vehicle Track Analysis – (Sheet 2 of 3) September 2018
- CD1.35 C1124-SK-A38-013 1.0 A38 Junction Improvements Vehicle Track Analysis – (Sheet 3 of 3) September 2018
- CD1.36 17090-00-100-411 Permitted Development Rights Reference Site Plan Rev 02 January 2020
- CD1.37 C1124-SK-A38-010 11.0 A38 Junction Improvements April 2019
- CD1.38 40506-Bri075c Integrated/embedded Landscape, Visual and Ecology Mitigation Masterplan