Core Documents
Network Rail
Network rail
- NR01 Application
- NR02 Draft Network Rail (Cambridgeshire Level Crossing Reduction) Order
- NR03 Explanatory Memorandum
- NR04 Statement of Aims
- NR05 Statement of Consultation
- NR06 Funding Statement
- NR07 Estimate of Costs
- NR08 Order plans and sections
- NR09 Book of Reference
- NR10 Planning Statement, which provides a description of the scope and purpose of the Application in relation to relevant legislative requirements, and planning policy
- NR11 Screening Decision Letter, which confirms that under the EIA Regulations the scheme has been deemed as having no significant impact on the environment and therefore does not require an Environmental Statement
- NR12 Design Guide which outlines the design proposal principles and components, including drawings for each level crossing
- NR13 Management of Health and Safety at Work Regulations 1999 (tab 1)
- NR14 ORR: Strategy for regulation of health and safety risks – 4: Level crossings (tab 2)
- NR15 ORR: Periodic Review 2013: Final determination of Network Rail’s output funding for 2014–19. Extracts relevant to level crossings (tab 3)
- NR16 Road Safety Audits for Cambridgeshire (tab 4)
- NR17 Transforming Level Crossings 2015–2040 (tab 5)
- NR18 Client Requirements Document Anglia CP5 Level Crossing Reduction Strategy (tab 6)
- NR19 CP5 Level Crossing Risk Reduction Fund Criteria, Governance and Reporting (tab 7)
- NR20 Network Rail Standard NR/L1/XNG/100: Level crossing asset management policy (tab 8)
- NR21 Network Rail Standard NR/L2/SIG/19608: Level crossing asset inspection and implementation of minimum actions codes (tab 9)
- NR22 Network Rail Operations Manual NR_L3_OCS_041_5-16: Risk Assessing Level Crossings (tab 10)
- NR23 Network Rail Level Crossing Guidance 01: Completion of Site Visit and Census Forms (tab 11)
- NR24 Anglia Route Study (March 2016) (tab 12)
- NR25 Censuses of Cambridgeshire sites (tab 13)
- NR26 Network Rail Statement of Case
Cambridgeshire County Council (CCC)
Bundle 1
- 01 Chronology of Events
- 02 Summary CCC Position
- 03 CCC Network Rail Level Crossings Consultation Response
- 04 Objection to C23, C24 Ely proposals - A Churchard
- 05 South Cambridgeshire District Council response to NR Policies
- 06 East Cambridge District Council response to NR Policies
- 07 Fenland District Council response to NR proposed level crossing closures
- 08 CCC complaint to Tracsis over late notification and inadequacy of traffic census
- 09 Traffic census rationale received from Mott MacDonald
- 10 CCC letter to Mott MacDonald regarding concerns over the traffic census methodology and purpose
- 11 CCC email to Mott MacDonald concerning additional censuses required
- 12 Email correspondence CCC- Mott MacDonald re additional traffic surveys
- 13 Mott MacDonald response regarding traffic census methodology
- 14 Cambridgeshire County Council Business Plan 2017-18, Section 1 only
- 15 Highway Infrastructure Asset Management Plan (HIAMP)
- 16 Local Transport Plan 3 (LTP3) and Long Term Transport Strategy
- 17 Public Rights of Way (PROW) Improvement Plan
- 18 Heath & Wellbeing Strategy 2017-18
- 19 CCC Diversion Policy and Guidance
- 20 Network Rail letter to the Ramblers’ Association on 15th November 2016
- 21 Adoption of NMU routes scoring by proposal
- 22 Photographs showing existing routes and proposed routes for proposals to which CCC objects
- 23 Table of PROW statistics for Cambridgeshire
- 24 Cambridgeshire Definitive Map Extracts
- 25 Cambridgeshire Table of Definitive Statements by path and crossing
- 26 Cambridgeshire County Council List of Streets
- 27 Large County-wide composite Highway & PROW Maps
- 28 Diversion Order-style plans
- 29 CCC email 11.08.2017 raising concerns about location of Public Inquiry
- 30 Table analysing additional lengths
- 31 Comparison of Definitive Map With TWAO Plans summary
- 32 Comparison of Definitive Map with TWAO Plans detail
- 33 Comparison of Definitive Map With TWAO Plans APPENDICES
- 34 NR Crossing Risk Summary
- 35 Mott MacDonald response 03.10.2017 regarding flood data
- 36 Environment Agency Flood Information
- 37 Littleport FP11 2004 Public Inquiry Inspector’s Report
- 38 CCC-NR email exchanges regarding status of Poplar Drove 08.07.2016
- 39 Poplar Drove Highway handover map 1930
- 40 Highway handover maps Isle of Ely Key
- 41 Extract from 1910 Finance Act Map – Poplar Drove
- 42 BS5709 Gaps Gates Stiles Specification
- 43 Public Rights Of Way Network Maps
- 44 Bishops’ Way Leaflet
- 45 Hereward Way Leaflet
- 46 Cawdle Fen Walk Leaflet
Bundle 2
- 1 CCC Response_Consultation July 2016
- 2 CCC HCI Committee paper Dec 2016
- 3 CCC HCI Committee Jan 2017
- 4 CCC HCI Committee Feb 2017
- 5 CCC formal response pre-TWAO 21 March 2017
- 6 CCC Holding Objection to TWAO 19 Apr 2017
- 7 CCC Response to draft TWAO HCI Committee
- 8 CCC Response to DfT Jul 2017
- 9 Amendment to CCC Position 2 Feb 2017