Core Documents
- NR-01 Application
- NR-02 Draft Order
- NR-03 Explanatory Memorandum
- NR-04 Statement of Aims
- NR-05 Funding Statement
- NR-06 Estimate of Costs
- NR-07 Consultation Report
- NR-08 Book of Reference
- NR-09 Works and Land Plan
- NR-10 Screening decision
- NR-11 Rule 18 Waiver
- NR-12 Request for Deemed Planning Permission and Statement of Proposed Conditions
- NR-13 Planning Statement
- NR-14 Planning Drawings - Drawing 01 Location Plan
- NR-14 Planning Drawings - Drawing 02 Existing and Proposed Site Layout Plan
- NR-14 Planning Drawings - Drawing 03 Existing and Proposed Highway Bridge Layout Plans
- NR-14 Planning Drawings - Drawing 04 Existing and Proposed Highway Bridge Elevations (NE)
- NR-14 Planning Drawings - Drawing 05 Existing and Proposed Highway Bridge Elevations (SW)
- NR-14 Planning Drawings - Drawing 06 Proposed Highway Bridge Site Sections
- NR-14 Planning Drawings - Drawing 07 Existing and Proposal Common Lane Junction Layout
- NR-14 Planning Drawings - Drawing 08 Existing and Proposed Footbridge Layout Plans
- NR-14 Planning Drawings - Drawing 09 Existing and Proposed Footbridge Elevations (NE)
- NR-14 Planning Drawings - Drawing 10 Existing and Proposed Footbridge Elevations (SW)
- NR-14 Planning Drawings - Drawing 11 Proposed Footbridge Site Sections
- NR-14 Planning Drawings - Drawing 12 Existing and Proposal Car Park Layout Plans
- NR-15 Design and Access Statement.
- NR-16 Environmental Report-Volume 1-Main Text
- NR-16 Environmental Report-Volume 2-Figures
- NR-16 Environmental Report Volume 3-Appendices
- NR-17 Code of Construction Practice
- NR-18 Statement of Case
- NR-19 Decision Letter Huddersfield to Westtown (Dewsbury) Order
- NR-20 Signalling Design Module X01Level Crossings General
- NR-21 Signalling Design Mod X40 Level Crossing Miniature Stop Lights
- NR-22 Commitment Letter to Selby District Council
- NR-23 Commitment Letter to North Yorkshire Council
- NR-24 Network Rail Transforming Level Crossings 2015–2040
- NR-25 ORR Health and Safety Strategic Risk Chapter-4 level-crossings
- NR-26 Levelling Up the United Kingdom
- NR-27 Integrated Rail Plan for the North and Midlands – 2021
- NR-28 The National Infrastructure Delivery Plan
- NR-29 Transport for the North Final Strategic Transport Plan 2019
- NR-30 National Planning Policy Framework
- NR-31 Proof of Evidence Needs Case
- NR-31-A Summary Proof of Evidence Needs Case
- NR-32 Proof of Evidence Engineering and Design
- NR-32-A Summary Proof of Evidence Engineering and Design
- NR-33 Proof of Evidence Property.
- NR-33-A Summary Proof of Evidence Property
- NR-34 Proof of Evidence Planning
- NR-34-A Summary Proof of Evidence Planning
- NR-35 Proof of Evidence Environmental Management
- NR-35-A Summary Proof of Evidence Environmental Management
- NR-36 Proof of Evidence Flood Risk
- NR-36-A Summary Proof of Evidence Flood Risk
- NR-37 Proof of Evidence Landscape Visual Amenity
- NR-37-A Summary Proof of Evidence Landscape Visual Amenity
- NR-38 Decarbonising Transport A Better Greener Britain
- NR-39 Network Rail Traction Decarbonisation Network Strategy
- NR-40 Connecting People November 2017
- NR-41 Enhancing Level Crossing Safety 2019-2029
- NR-42 Office of Road and Rail Principles for Managing Level Crossing Safety
- NR-43 Office for Road and Rail Strategy for Regulation of Health and Safety Risks
- NR-44 Office of Road and Rail Level Crossings a Guide to Managers Designers Operators
- NR-45 National Infrastructure Strategy November 2020
- NR-46 Inspector Report to Secretary of State Huddersfield to Westtown (Dewsbury Improvements) Order 202[ ]
- NR-47 Government's Rail Network Enhancement Pipeline 2018
- NR-48 Government Rail Network Enhancements Pipeline 2019
- NR-49 North Yorkshire Local Transport Plan
- NR-50 West Yorkshire Transport Strategy 2040
- NR-51 Leeds City Region Strategic Economic Plan
- NR-52 Selby District Core Strategy Oct 2013
- NR-53 Saved Policies 2005
- NR-54 Selby Pre submission Publication Local Plan
- NR-55 Town and Country Planning General Permitted Development Order 2015
- NR-56 National Policy Statement for National Networks 2015
- NR-57 Letter from Selby District Council to Transport Infrastructure Unit
- NR-58 Minerals and Waste Plan