Huddersfield to Westtown (Dewsbury)
Home
Huddersfield to Westtown (Dewsbury)
Inquiry documents
Documents Submitted during Inquiry
Documents Submitted during Inquiry
Documents Submitted during Inquiry
INQ-01 Opening Statement on behalf of Network Rail Infrastructure Limited (NR)
INQ-02 List of Appearances on behalf of NR
INQ-03a Property Objectors’ Status Update
INQ-03 Status of Objectors affected by the Order Compulsory Acquisition Powers
INQ-04 Compliance Pack - Submitted on behalf of NR in support of confirmation of compliance with statutory formalities
INQ-05a Paper of Order Amendments to be read in conjunction with INQ/9A and INQ/10A
INQ-05 Paper of Order Amendments (To be read in conjunction with updated Network Rail Core Documents NR02.1 and NR02.2 submitted as INQ/9 and INQ/10)
INQ-06a List of Listed Building Consent proposed conditions, with changes to the draft conditions contained in INQ-6 made following the conditions session shown in track changes
INQ-06 Consolidated amendments to NR’s proposed conditions for the Listed Building Consent Applications (NR17 to NR25) – Amendments Shown as Tracked Changes (To be read in conjunction with INQ/07 and Statement of Common Ground NR/SOCG/1)
INQ-07 Post application correspondence between NR and Historic England on the TWA Order and Listed Building Consent Applications
INQ-08 NR letter to the Transport Infrastructure Planning Unit dated 28 October 2021 – Confirming status of need for protective species licence in respect of Great Crested Newts (To be read in conjunction with updated NR Core Document NR10.1 submitted as
INQ-09a Tracked amended Draft Order 2 December 2021
INQ-09 Draft Order – As amended 2 November 2021 – Amendments Shown as Tracked Changes (To be read in conjunction with INQ/5)
INQ-10a Clean amended Draft Order 2 December 2021
INQ-10 Draft Order – As amended 2 November 2021 – Clean Version (To be read in conjunction with INQ/5)
INQ-11 Amended List of consents, permissions or licences under other enactments – Amendments shown as Tracked Changes (To be read in conjunction with INQ/8)
INQ-12a Amended conditions proposed to be attached to the direction for deemed planning permission - Amendments dated 30 November 2021 to Appendix 2 (NR12)
INQ-12 App 2 – Amended conditions proposed to be attached to the direction for deemed planning permission – As amended 2 November 2021 – Amendments Shown as Tracked Changes (To be read in conjunction with Statement of Common Ground NR/SOCG/1 and INQ/07)
INQ-12b List of Deemed Planning Permission proposed conditions, with changes to the draft conditions contained in INQ-12A made following the conditions session shown in track changes
INQ-13 Environmental Statement – Vol 2i Chapter 20: Public Open Space – As amended 2 November 2021 (Amendments shown tracked)
INQ-14a Post Application Correspondence between Natural England and Network Rail
INQ-14 Post application correspondence between Natural England and NR regarding NR’s applications for protective species licences (bats) and a badger licence in consequence of the TWA Order works
INQ-15 Plan identifying Thornhill Quarry and Dewsbury Sand and Gravel
INQ-16 Notice of the revocation of the Kirklees Council Huddersfield Town Centre Blueprint Supplementary Planning Document (SPD) dated 27 October 2020
INQ-17a Green Belt Plan – Heaton Lodge Curve
INQ-17b Green Belt Plan – Stenard Lane
INQ-18 Kirklees Cycling Campaign Advisers
INQ-19 Letter to Huddersfield Town Association Football Club
INQ-20 Letter of Support from Kirklees Council
INQ-21a Email from West Yorkshire Combined Authority dated 2 November 2021 (following WYCA letter of support to DfT (INQ-21))
INQ-21 Letter of Support from West Yorkshire Combined Authority
INQ-22 Supplementary Objection on behalf of Veolia
INQ-23 Summary Note on Agreement between Network Rail and Yorkshire Combined Authority dated 8 November 202
INQ-24 Calder Road - Design Refinement 8 November 2021
INQ-25 Summary Note on Agreements between Kirklees Council & Network Rail dated 22 October 2021
INQ-26 Historic Environment Assessment Technical Note
INQ-27 Northern Power Grid (Yorkshire Limited) - Letter to the Inspector dated 23 November 2021
INQ-28 Network Rail Commitments Letter to HD1 Developments Limited 25.11.21
INQ-29 Huddersfield Station Subway Drawing
INQ-30 NR Commitments Letter to Veolia 25.11.21 including Construction Sequencing Document
INQ-31 Network Rail Response to Veolia supplementary objection
INQ-32 Network Rail Note on Integrated Rail Plan
INQ-33 Integrated Rail Plan, Department for Transport, November 2021
INQ-34 Network Rail Note on Rule 15 Notices and copies of Rule 15 Notices served on Kinder Properties Limited, DP Realty Limited and R&D Yorkshire Limited
INQ-35 Network Rail Note on Cycling Policy together with Local Transport Note: LTN 1/20 Cycling Infrastructure Design and Traffic Management Act 2004: network management to support recovery from COVID-19
INQ-36 Goods Vehicle Operator's Licence, Veolia - 21.10.91
INQ-37 Huddersfield Town Centre Conservation Area Map
INQ-38 Environment Agency Statement on Flood Risk, 2 December 2021
INQ-39a Further SOCG between Network Rail and Environment Agency, signed 7 December 2021
INQ-39 Network Rail and Environment Agency Statement of Common Ground, signed 2 December 2021
INQ-40 Network Rail Note on Apprenticeships
INQ-41 Closing Submissions on behalf of Network Rail, 3 December 2021
INQ-42 Inspector's Directions, 6 December 2021
INQ-43 Itinerary for Inspectors' Site Visits on 1 and 2 December 2021
INQ-44 David Strafford email dated 11 November 2021 re compliance
INQ-45 Inspector's Notice of Closure of the Inquiry