Documents Submitted During Inquiry
- INQ-01 Opening Statement on behalf of the London Borough of Southwark (LBS)
- INQ-02 Opening Statement on behalf of Historic England (HE)
- INQ-03 Opening Statement on behalf on the Appellant (APP)
- INQ-04 Letter of Objection sent to the Planning Inspectorate - Haijun Sun
- INQ-05 APP response to SJ Platts Statement on behalf of LSB
- INQ-06 Wind Note Produced by Wirth in response to the objection received from the Cathedrals Fabric Commission
- INQ-07 Simon Allford - Overview Presentation
- INQ-08 Appellant overlay of 2018 Scheme
- INQ-09.1 Presentation of Images to Evidence in Chief of Elizabeth Adams
- INQ-09.2 Figure Reference Table to Image Presentation
- INQ-10 National Trust Written Statement New City Court proposal on George Inn
- INQ-11 LBS Note on Building Consent Application
- INQ-12 Listed Building Consent BREEAM Upgrades to Existing Fabric
- INQ-13 Letter from JLL clarifying position raised in Chris Goddard's Evidence dated 26.07.22
- INQ-14 Letter dated 27 July 2022 from RPS on behalf of owners of various buildings at the Shard Quarter
- INQ-15 Plan showing boundaries of the Bankside, Borough and London Bridge Opportunity Area
- INQ-16.1 Alasdair Young Presentation to Inquiry on behalf of Historic England
- INQ-16.2 Associated Reference Sheet to INQ-16.1
- INQ-17 Simon Allford Presentation of Evidence in Chief
- INQ-18 Statement by WSP on behalf of Guys and St Thomas' Trust
- INQ-19 EIP07 Full Representations to Proposed Submission Version cut to DP9s letter
- INQ-20 Pages from AV010 PSV CS London Bridge
- INQ-21 Servicing Review Route
- INQ-22 Existing Road Markings and Signage July 2022
- INQ-23 TfL consultation on changes to Borough High Street, St Thomas Street and London Bridge
- INQ-24 Pedestrian Movement Space Syntax Analysis referred to by Simon Allford
- INQ-25 New City Court Development Guy's Hospital Occupation
- INQ-26 Statement following Cross Examination of Peter Stewart
- INQ-27 TPP Note in response to TfL Consultation (INQ 23)
- INQ-28 Details of Site Visit on 05.08.22.
- INQ-29.1 S106 dated 08.08.22 between LBS and Applicant (Clean)
- INQ-29.2 S106 tracked changes from 05.08.22 to 08.08.22
- INQ-29.3 Completed S 106 (18.AP.4039) - 08.09.22
- INQ-29.4 Completed S 106 (21.AP.1361) - 08.09.22
- INQ-30 Updated CIL Compliance Statement (2018 Scheme)
- INQ-31 Updated CIL Compliance Statement (2021 Scheme)
- INQ-32 Public Benefits Comparison Schedule
- INQ-33 Note on Pedestrian Interactions with the Proposed New Station Access
- INQ-34 Conybeare House Planning Note 10.08.22
- INQ-35.1 Agreed Conditions as at 10.08.22 (2018 Scheme)
- INQ-35.2 Conditions tracked changes from 04.08.22 to 10.08.22 (2018 Scheme)
- INQ-36.1 Agreed Conditions as at 10.08.22 (2021 Scheme)
- INQ-36.2 Conditions tracked changes from 04.08.22 to 10.08.22 (2021 Scheme)
- INQ-37 Closing Statement on behalf of the London Borough of Southwark
- INQ-38 Closing Statement on behalf of Historic England
- INQ-39 Closing Statement on behalf of the Appellant