A: Core Documents
Network Rail Core Documents
- NR00 Statement of Matters
- NR01 - Application
- NR02 - Draft Network Rail (Suffolk and Others Level Crossing Reduction) Order
- NR03 - Explanatory Memorandum
- NR04 - Statement of Aims
- NR05 - Statement of Consultation
- NR06 - Funding Statement
- NR07 - Estimate of Costs
- NR08 - Works Land and Rights of Way Plans and Section Plans
- NR09 - Book of Reference
- NR10 - Planning Statement, which provides a description of the scope and purpose of the Application in relation to relevant legislative requirements, and planning policy
- NR11 - Screening Decision Letter, which confirms that under the EIA Regulations the scheme has been deemed as having no significant impact on the environment and therefore does not require an Environmental Statement
- NR12 - Design Guide which outlines the design proposal principles and components, including drawings for each level crossing
- NR13 - Management of Health and Safety at Work Regulations 1999 (tab 1)
- NR14 - ORR: Strategy for regulation of health and safety risks – 4: Level crossings (tab 2)
- NR15 - ORR: Periodic Review 2013: Final determination of Network Rail’s output funding for 2014–19. Extracts relevant to level crossings—the entire document is available at http://www.orr.gov.uk/rail/economicregulation/regulation-of-network-rail/price-con
- NR16 - Road Safety Audits for Suffolk (tab 4)
- NR17 - Transforming Level Crossings 2015–2040 (tab 5)
- NR18 - Client Requirements Document Anglia CP5 Level Crossing Reduction Strategy (tab 6)
- NR19 - CP5 Level Crossing Risk Reduction Fund Criteria, Governance and Reporting (tab 7)
- NR20 - Network Rail Standard NR/L1/XNG/100: Level crossing asset management policy (tab 8)
- NR21 - Network Rail Standard NR/L2/SIG/19608: Level crossing asset inspection and implementation of minimum actions codes (tab 9)
- NR22 - Network Rail Operations Manual NR_L3_OCS_041_5-16: Risk Assessing Level Crossings (tab 10)
- NR23 - Network Rail Level Crossing Guidance 01: Completion of Site Visit and Census Forms (tab 11)
- NR24 - Anglia Route Study (March 2016) (tab 12)
- NR25 - Censuses of Suffolk sites (tab 13)
- NR26 - Network Rail Statement of Case
Suffolk County Council Core Documents
- OBJ/29/C01 A Joint Health and Wellbeing Strategy for Suffolk: Refreshed for 2016 – 2019
- OBJ/29/C02 Bury St Edmunds – Inset 1 (February 2015)
- OBJ/29/C03 Bury St Edmunds: Vision 2031
- OBJ/29/C04 Commuted Sums for Maintaining Infrastructure Assets
- OBJ/29/C05 Cycling and Walking Investment Strategy (March 2016)
- OBJ/29/C06 Green Access Strategy Policies and Action Plan (Draft)
- OBJ/29/C07 Highway Infrastructure Asset Management Plan (2016)
- OBJ/29/C08 Highway Infrastructure Asset Management Strategy (November 2015)
- OBJ/29/C09 Rights of Way Improvement Plan 2006 - 2016 part 1
- OBJ/29/C09 Rights of Way Improvement Plan 2006 - 2016 part 2
- OBJ/29/C10 St Edmundsbury Core Strategy: Local Development Framework (December 2010)
- OBJ/29/C11 Suffolk Local Transport Plan 2011 – 2031: Part 1 – Transport Strategy
- OBJ/29/C12 Suffolk Rail Prospectus
- OBJ/29/C13 Suffolk Walking Strategy 2015 - 2020
- OBJ/29/C14 Suffolk’s Nature Strategy
- OBJ/29/C15 Transforming Suffolk: Suffolk’s Community Strategy 2008 – 2028