Documents Submitted During Inquiry
- INQ-01 Opening Statement on behalf of the London Borough of Richmond Upon Thames (LBR)
- INQ-02 (LBR-21) Compliance Note
- INQ-03 (LBR-22) AA Revised Definitions
- INQ-04 (LBR-23) Modified Order Schedule
- INQ-05 (LBR-24) Update Note on Status of Stopping Up Order
- INQ-06 (LBR-25) Withdrawal of Objection submitted by Port of London Authority
- INQ-07 Twickenham Riverside Trust Opening Statement
- INQ-08 Note on LBR-5 Appendix 35.(LBR-26)
- INQ-09 Twickenham Society Additional Statement 07.06.23
- INQ-10 David Marlow's updated Statement 7 June 2023
- INQ-11.1 Eel Pie Island Association & Eel Pie Boatyard Statement as read
- INQ-11.2 Twickenham Riverside Presentation Sep 2016
- INQ-11.3 Mark Montgomery Smith as read
- INQ-12 CH Open Space and Design
- INQ-13 (LBR-27) Housing Delivery and Targets Note
- INQ-14 Mark Brownrigg - Planning Policy on behalf of Twickenham Riverside Trust
- INQ-15 G Strudwick Presentation as read
- INQ-16 D Marlow - Notes raised on 13 June 2023
- INQ-17 (LBR-28) AA Note on Timelapse Footage
- INQ-18 Extract from Local Plan Publication (Regulation 19) June 2023 - Site Allocation 17
- INQ-19 (LBR-29) Additional Note on LBR5 Appendix 35
- INQ-20 (LBR-30) Podium Edge Measurements Plan
- INQ-21 (LBR-31) Programme for Adoption of the Draft Local Plan
- INQ-22 Revised Statement of Janine Fotiadis-Negrepontis submitted by TRT
- INQ-23-1 TRT Presentation for Ted Cremin Evidence
- INQ-23-2 Ted Cremin - Consultation and Engagament
- INQ-23-3 Ted Cremin - Negotiations
- INQ-23-4 Ted Cremin - Justification
- INQ-24 (LBR-32) Agreed Existing Land Uses between AA and TRT
- INQ-25 (LBR33) AA Rebuttal to INQ-9 Twickenham Society
- INQ-26 (LBR-34) AA Rebuttal to INQ-10 & INQ-16 D Marlow.
- INQ-27 (LBR-35) AA Rebuttal to INQ-11.1 Eel Pie Island
- INQ-28 (LBR-36) AA Rebuttal to INQ-11.3 M Montgomery-Smith
- INQ-29-1 Road Safety Audit March 2022 submitted by C Heath on behalf of EPIBC
- INQ-29-2 Systra Study 1 submitted by C Heath on behalf of EPIBC
- INQ-29-3 Systra Study 2 submitted by C Heath on behalf of EPIBC
- INQ-30 Additional submission from Deon Lombard
- INQ-31 (LBR-37) AA Note on Proposed Modification
- INQ-32 (LBR-38) AA Note of Viability
- INQ-33 (LBR-39) Urban heat response to Ms Fotiadis-Negrepontis
- INQ-34 LBR 40 Further response to Mr Heath
- INQ-35 (LBR-41) CAVAT Report
- INQ-36 (LBR-42) Response to Mr Cremin evidence
- INQ-37 (LBR-43) Rebuttal to J Garrow
- INQ-38 (LBR-44) Rebuttal to J Rowles
- INQ-39 (LBR-45) Objector Wayfinding document
- INQ-40 TRT Legal Submissions
- INQ-41 (LBR-46) Areas of Agreement & Disagreement between LBR and TRT
- INQ-42 Site Visit Itinerary
- INQ-43.1 TRT Closing Statement - CPO
- INQ-43.2 TRT Closing CPO (para 76 corrected)
- INQ-44.1 TRT s. 19 Closing Statement
- INQ-44.2 Appendices to TRT s.19 Closing Statement
- INQ-45.1 Twickenham - Statement of Closing - LBR
- INQ-45.2 Twickenham - Statement of Closing - LBR (as read)
The Trust also presented the Inquiry with some time-lapse film of the Scheme land. This was viewed in the Inquiry room and not on-line by the Inquiry on Thursday 22 June. The film is retained by the Trust and any further enquiries should be directed to the Twickenham Riverside Trust.