CD1 - Application Documents
CD1-01 to CD1-09 Application Documents
- CD1-01 Application Letter
- CD1-02 Cambridge South East Transport Scheme Order
- CD1-03 Explanatory Memorandum
- CD1-04 Statement of Aims
- CD1-05.01 Consultation Report
- CD1-05.02 Appendix A - Statement of Community Involvement
- CD1-05.03 Appendix B - Schedule 5 and 6 Consultees
- CD1-05.04 Appendix C - 2016 Consultation Report
- CD1-05.05 Appendix D - 2016 Consultation Materials
- CD1-05.06 Appendix E - 2018 Consultation Report
- CD1-05.07 Appendix F - 2018 Consultation Materials
- CD1-05.08 Appendix G - 2019 consultation report
- CD1-05.09 Appendix H - 2019 Consultation Materials
- CD1-05.10 Appendix I - 2020 Consultation Report
- CD1-05.11 Appendix J - 2020 Consultation Materials
- CD1-05.12 Consultation Report Appendix K - 2021 Supplementary Engagement Responses 9 January 2025
- CD1-05.13 Appendix L - 2022 Consultation Report
- CD1-05.14 Appendix M - Consultation Materials
- CD1-05.15 Appendix N - Outline Business Case Strategic Case
- CD1-05.16 Consultation Report Appendix O - Shelford Railway Alternative Design Development and Feasibility Assessment 9 January 2025
- CD1-05.17 Consultation Report Appendix P - Continued Landowner and Stakeholder Engagement Log 2023 to 2024 9 January 2025
- CD1-05.18 Appendix Q - Draft Order Consultees
- CD1-06 Declaration of Status of Applicant
- CD1-07 List of consents, permissions or licences
- CD1-08 Funding Statement
- CD1-09 Estimate of Costs
CD1-10 Environmental Statement and Appendices
- CD1-10.01 Environmental Statement Volume 1 Non-Technical Summary
- CD1-10.02 Environmental Statement Volume 2 Main Report (ES Main Report)
- CD1-10.03 Appendix 1.1 Competent Expert Evidence
- CD1-10.04 Appendix 2.1 Drainage Strategy
- CD1-10.05 Appendix 2.2 Landscape and Ecological Management Plan
- CD1-10.06 Appendix 2.3 Draft Spoils Management Strategy
- CD1-10.07 Appendix 2.4 Code of Construction Practice
- CD1-10.08 Appendix 2.5 Construction Environment Management Plan
- CD1-10.09 Appendix 2.6 Construction Lighting Plan
- CD1-10.10 Appendix 2.7 Register of Environmental Actions and Commitments
- CD1-10.11 Appendix 5.1 ES Scoping Report
- CD1-10.12 Appendix 5.2 Scoping Opinion
- CD1-10.13 Appendix 6.1 Further Details on Method
- CD1-10.14 Appendix 6.2 Air Quality Model Verification
- CD1-10.15 Appendix 6.3 Air Quality Model Results
- CD1-10.16 Appendix 6.4 Air Quality - Traffic Data Analysis
- CD1-10.17 Appendix 7.1 Long Term Noise Monitoring Data
- CD1-10.18 Appendix 7.2 Construction Noise Assessment
- CD1-10.19 Appendix 7.3 Construction Vibration Assessment
- CD1-10.20 Appendix 7.4 Operational Noise Magnitude of Impact
- CD1-10.21 Appendix 7.5 Modelled Operational Noise Maps
- CD1-10.22 Appendix 7.6 Noise - Traffic Data Analysis
- CD1-10.23 Appendix 8.1 Flood Risk Assessment
- CD1-10.24 Appendix 8.2 Flood Modelling Report
- CD1-10.25 Appendix 8.3 Water Framework Directive Assessment
- CD1-10.26 Appendix 9.1 Ground Investigation Report
- CD1-10.27a Appendix 9.2 Tetra Tech Report: Appendix A - Drawings
- CD1-10.27 Appendix 9.2 Tetra Tech Report
- CD1-10.27b Appendix 9.2 Tetra Tech Report: Appendix B - Report Conditions
- CD1-10.27c1 Appendix 9.2 Tetra Tech Report: Appendix C1 - Borehole Logs
- CD1-10.27c2 Appendix 9.2 Tetra Tech Report - Appendix C2 - Trial Pit Logs
- CD1-10.27c3 Appendix 9.2 Tetra Tech Report: Appendix C3 - Inspection Pit Logs
- CD1-10.27d Appendix 9.2 Tetra Tech Report: Appendix D - CPT Logs and Report
- CD1-10.27e Appendix 9.2 Tetra Tech Report: Appendix E - Plate Load Testing Logs
- CD1-10.27f Appendix 9.2 Tetra Tech Report: Appendix F - Soil Infiltration Testing Logs
- CD1-10.27g Appendix 9.2 Tetra Tech Report: Appendix G - DCP Logs
- CD1-10.27h Appendix 9.2 Tetra Tech Log: Appendix H - Sampling and Monitoring Records
- CD1-10.27i Appendix 9.2 Tetra Tech Report - Appendix I - Water Quality Data
- CD1-10.27j Appendix 9.2 Tetra Tech Report: Appendix J - Geotechnical Laboratory Certificate
- CD1-10.27k1 Appendix 9.2 Tetra Tech Report: Appendix K1 - Geoenvironmental Laboratory Certificates – Soil
- CD1-10.27k2 Appendix 9.2 Tetra Tech Report: Appendix K2 - Geoenvironmental Laboratory Certificates – Water
- CD1-10.27l Appendix 9.2 Tetra Tech Report: Appendix L - SPT Calibration Certificate
- CD1-10.27m1 Appendix 9.2 Tetra Tech Report: Appendix M (part1) - Photographic Records
- CD1-10.27m2 Appendix 9.2 Tetra Tech Report: Appendix M (part 2) - Photographic Records
- CD1-10.27n Appendix 9.2 Tetra Tech Report: Appendix N - UXO Risk Assessment
- CD1-10.28 Appendix 9.3 Agricultural Land Classification Report
- CD1-10.29 Appendix 9.4 Contaminated Land Risk Assessment
- CD1-10.30 Appendix 9.5 Envirocheck Report
- CD1-10.31 Appendix 10.1 Habitats Survey
- CD1-10.32 Appendix 10.2 Bat Surveys
- CD1-10.33 Appendix 10.3 Bird Surveys
- CD1-10.34 Appendix 10.4 Badger Surveys
- CD1-10.35 Appendix 10.5 Otter and Watervole Surveys
- CD1-10.36 Appendix 10.6 Hedgehog Surveys
- CD1-10.37 Appendix 10.7 Reptile Surveys
- CD1-10.38 Appendix 10.8 Invertebrate Surveys
- CD1-10.39 Appendix 10.9 White Clawed Crayfish
- CD1-10.40 Appendix 10.10 GNC Surveys
- CD1-10.41 Appendix 10.11 Habitat Regulations Assessment
- CD1-10.42 Appendix 10.12 Biodiversity Net Gain
- CD1-10.43 Appendix 10.13 Scenario Modelling for Rivers Biodiversity Net Gain
- CD1-10.44 Appendix 11.1 Viewpoint Photo Sheets
- CD1-10.45 Appendix 11.2 Photomontages
- CD1-10.46 Appendix 11.3 Lighting Impact Assessment
- CD1-10.47 Appendix 11.4 Arboricultural Impact Assessment
- CD1-10.48 Appendix 12.1 Archaeological Aerial Investigation and Mapping
- CD1-10.49 Appendix 12.2 Desk Based Assessment
- CD1-10.50 Appendix 12.3 Geophysical Survey Report No.1 Route Alignment
- CD1-10.51 Appendix 12.4 Geophysical Survey Report No.2 Travel Hub
- CD1-10.52 Appendix 12.5 Archaeological Evaluation Report
- CD1-10.53 Appendix 13.1 Lower Super Output Areas
- CD1-10.54 Appendix 13.2 Ward Level Health Profiles
- CD1-10.55 Appendix 14.1 Traffic and Transport Data
- CD1-10.56 Appendix 15.1 Climate Vulnerability Detailed Baseline
- CD1-10.57 Appendix 16.1 Carbon Management Plan
- CD1-10.58 Appendix 18.1 Cumulative Effects Project Long List
- CD1-10.59 The Cambridge South East Transport Deposit Model
- CD1-10.60 Addendum to heritage Desk-Based Assessment (DBA)
CD1-11 Deposited Order Plans
- CD1-11.01 Works and Land Plan including Longitudinal Sections
- CD1-11.02 Cross Sections for Proposed Works
- CD1-11.03 Engineering Drawings of Permanent and Temporary Structures
- CD1-11.04 Rights of Way and Traffic Regulation Plans - Volume 1
- CD1-11.05 Rights of Way and Traffic Regulation Plans - Volume 2
- CD1-11.06 Rights of Way and Traffic Regulation Plans - Volume 3
CD1-12 Deemed Planning Drawings
- CD1-12.01 Scheme Location Plan
- CD1-12.02 Existing Site Plans
- CD1-12.03 Existing Site Sections
- CD1-12.04 Proposed Site Plans - Volume 1
- CD1-12.05 Proposed Site Plans - Volume 2
- CD1-12.06 Proposed Site Plans - Volume 3
- CD1-12.07 Proposed Site Sections
- CD1-12.08 Structures
- CD1-12.09 Construction Compounds
CD1-13 Book of Reference
CD1-14 Deemed Planning Permission
CD1-15 Planning Statement
CD1-16 Equality Impact Statement and Technical Note
CD1-17 Design and Access Statement
CD1-18 Transport Assessment
- CD1-18.01 Transport Assessment
- CD1-18.02 Transport Assessment - Appendix A - 1. Scoping Note and 2. Cambridgeshire County Council Response
- CD1-18.03 Transport Assessment Appendix B B.1. CSET Phase 2 Scheme Overview
- CD1-18.04 Transport Assessment - Appendix C - CSET Public Rights of Way (PRoW) Map
- CD1-18.05 Transport Assessment - Appendix D - Sawston Greenway
- CD1-18.06 Transport Assessment - Appendix E - Travel Hub
- CD1-18.07 Transport Assessment - Appendix F - Sawston Stop and Babraham Road Crossing
- CD1-18.08 Transport Assessment - Appendix G - Stapleford Stop and Haverhill Road Crossing
- CD1-18.09 Transport Assessment - Appendix H - Great Shelford Stop and Hinton Way Crossing
- CD1-18.10 Transport Assessment - Appendix I - Francis Crick Avenue
- CD1-18.11 Transport Assessment - Appendix J J.1. CSET 2029 Interim Model Technical Note
- CD1-18.12 Transport Assessment - Appendix K - ATR Interactions with DNA Cycle Path
- CD1-18.13 Transport Assessment - Appendix L - CSRM2 Technical Assurance Technical Note
- CD1-18.14 Transport Assessment - Appendix M - CSRM2 F-Series Alternative LU scenarios Technical Note
- CD1-18.15 Transport Assessment - Appendix N - A11_A1307 Roundabout – ARCADY Junction Modelling Results
- CD1-18.16 Transport Assessment - Appendix O - A11 Travel Hub Access Roundabout - ARCADY Junction Modelling Results
- CD1-18.17 Transport Assessment - Appendix P - FCA_CGB Junction - Linsig Junction Modelling Results
- CD1-18.18 Transport Assessment - Appendix Q - (Q1) FCA_DMAW_Addenbrooke's Road Junction Modelling Results (Base and Do-Minimum) (Q2) FCA/DMAW/Addenbrooke's Road Junction - Linsig Junction Modelling Results (Do-Something)
- CD1-18.19 Transport Assessment - Appendix R - High Growth Addendum
- CD1-18.20 Transport Assessment - Appendix S - Walking, Cycling and Horse-Riding Assessment Report (WCHAR)
CD1-19 to CD1-25 Outline Business Case and Addenda
- CD1-19.01 Outline Business Case Appendix I Social Impact Appraisal
- CD1-19 Outline Business Case (OBC)
- CD1-20 Strategic Dimension Refresh
- CD1-21 Economic Dimension Addendum and Appendix A: Key Elements of the Economic Dimension
- CD1-22 Financial Dimension Addendum
- CD1-23 Commercial Dimension Addendum and Appendix A: Key Commercial Dimension elements
- CD1-24 Management Dimension Addendum and Appendix A: Key Management Dimension elements
- CD1-25.01 Appendix 1.0 Future Growth in Greater Cambridge Technical Note
- CD1-25.02 Appendix 1.1 Greater Cambridge Local Plan - Strategy Topic Paper Update January 2023
- CD1-25.03 Appendix 1.2 Cambridge Biomedical Campus Vision 2050
- CD1-25.04 Appendix 1.3 Cambridge Ahead Housing Dashboard January 2023
- CD1-25.05 Appendix 1.4.1 Committed Developments in adjacent authorities April 2024
- CD1-25.06 Appendix 1.4.2 Allocated site - Emerging Allocations within Adjacent Authorities
- CD1-25.07 Appendix 1.5 Review of On Road Off-Road Options Technical Note
- CD1-25.08 Appendix 2.0 Economic Appraisal Technical Note
- CD1-25.09 Appendix 3.0 Scheme Cost Review
- CD1-25.10 Appendix 4.0 Risk Register
- CD1-25.11 Appendix 4.1 On Road Options Alignment
- CD1-25.12 Appendix 5.0 Pink Route Variant Alignment Technical Note
CD1-26 Notices and Compliance
- CD1-26.01 CSET Notice of application for TWAO – Cambridge News 9 January 2025
- CD1-26.02 CSET Notice of application for TWAO – Environment and Infrastructure 9 January 2025
- CD1-26.03 CSET Notice of application for TWAO – Cambridge News 15 January 2025
- CD1-26.04 Form 1 Rule 14(2) - CSET Notice of Application for an Order
- CD1-26.05 Form 2 Rule 14(6) - CSET Site Notice of Proposed Works
- CD1-26.06 Form 3 Rule 14(7) - CSET Notice for an Order which would extinguish public rights of way
- CD1-26.07 Form 3 Rule 14(7) CSET - Notice to Little Abington
- CD1-26.08 Form 5 Rule 15 CSET - Notice of an application to acquire land rights (Owner_Occupier)
- CD1-26-09 CSET Affidavit of compliance sworn by Richard Guyatt with exhibits 1-6