- Home
- Stalybridge Diggle
- Inquiry documents
- Core documents
- Additional NR Rebuttal Associated Documents - 29 May 26
NR Rebuttal Related Documents Submitted 29 May 2026
- NR144.0 Draft Order (NR02) – As Amended 29 May 2026 (Tracked Version)
- NR144.1 Draft Order As amended 7 July 2026 (Tracked Version)
- NR145.0 Draft Order (NR02) – As Amended 29 May 2026 (Clean Version)
- NR145.1 Draft Order (NR02) – As Amended 7 July 2026 (Clean Version)
- NR146.0 Consolidated Paper of Order Amendments (To be read in conjunction with NR144 and NR145)
- NR146.1 Updated Consolidated Paper of Order Amendments (To be read in conjunction with NR144 and NR145 plus NR144.1 and NR145.1)
- NR147 Planning Conditions (NR11 – Appendix 2) As amended 29 May 2026
- NR148 Application Document Amendments – For Changes to the Secondary Temporary Construction Area at the Brookfields Site (Mossley Station)
- NR149 Application Document Amendments – For Changes to the Extent of Extinguishment of Footpath 209 SADD
- NR150 Planning Direction Drawings (NR12) Revisions – Footpath Enhancement Works For Footpath 244 SADD